PROJECT DETAILS
One of a kind
This house was a one off design, which was carefully pieced together and influenced by the clients growing young family and their love for modern contemporary split level design
This was a green field site which was carefully surveyed to understand the extent of the split level design required. Planning permission was difficult to say the least, but persistence is a great attribute!
Structural Certificate
This house was built by direct labour (self-build) and I had input throughout its construction. A structural engineer was an absolute requirement for this design, as it was off standard and the main timber frame structure was a stick build (it was built on-site) so a structural certificate was required at the end of the build. I believe this certificate to be extremely important for protection for my clients and from if the property was ever sold, this certificate could be invaluable.
I work very closely with Tim Lenihan & Co, structural engineers on most of my projects and he provided a full structural certificate for this design, on completion.
WHAT WE DID
Planning / Design / Project Management